Due to flooding in the Toowoomba region that left rural unsealed roads severely damaged.
Stein Family Earthworks was entrusted by the Toowoomba regional council to repair unsealed roads round the Toowoomba region through the Toowoomba TRC flood recovery project.
This included:
Re-sheeting roads with gravel to enhance the strength and durability of the road.
Reforming unsealed rural roads to the requirements of the Toowoomba regional council
In order to allow for safer rural roads in the Toowoomba region.
Duration of the project: September 2023 - December 2024